|
|
News Breaks
|
January 17, 2012
|
| 06:37 EDT |  | XRA |
| theflyonthewall.com: | Exeter Resource announces Prefeasibility Study for Capische Project | | Exeter Resource announced that the Prefeasibility Study for its Caspiche Project in northern Chile has returned a pre-tax Net Present Value calculated from the time of commencement of the project, of $2,800M and average operating costs of $606 per ounce gold equivalent1. The gold production cost drops to $18 per ounce when copper and silver by-product credits are considered. The study predicts an average annual production over the nineteen year mine life of 696,000 ounces gold, 244M pounds of copper and 844,000 ounces silver. Overall copper recovery is 85.6% and gold recovery 67.6%. A National Instrument 43-101 compliant technical report covering the Prefeasibility Study has been filed and can be viewed at www.SEDAR.com and on the Company website. :theflyonthewall.com |
|
|
News For XRA From The Last 14 Days Check below for free stories on XRA the last two weeks.
There is 1 item on the Fly with pertinent information.
Sign up for a free trial to see the rest of the stories you've been missing. |
|
May 14, 2012
|
| 07:38 EDT |  | XRA |
|
|
|
|
|