| Under the terms of the contract signed, Hollysys is to provide engineering, procurement, and construction services for the Changping Line subway signaling systems, including system design, procurement, manufacture, inspection, testing, commissioning, personnel training. The Changping Line of the Beijing subway network is 31.24 kilometers in length with 11 stops, with Phase I to be completed in 2010 and Phase II in 2012. :theflyonthewall.com |