New User:

-or-
Username:
Password:
Forgot your password?

Stock Market & Financial Investment News

News Breaks
December 11, 2012
07:53 EDTHL, PAAS, SLW, AG, SSRIRBC Capital to host a conference
Silver Conference to be held in New York on December 11.
News For HL;PAAS;SLW;AG;SSRI From The Last 14 Days
Check below for free stories on HL;PAAS;SLW;AG;SSRI the last two weeks.
Sign up for a free trial to see the rest of the stories you've been missing.
July 21, 2014
13:21 EDTPAASPan American Silver says strike settled at San Vicente mine
Subscribe for More Information
July 16, 2014
14:55 EDTPAASPan American Silver says union at San Vicente mine on strike
Pan American Silver today announced that its union at the Company's San Vicente mine in Bolivia has gone on strike, effectively shutting down the entire operation. Personnel access has been restricted to only those needed to ensure maintenance of critical systems necessary to allow for a smooth restart, the company said. The work stoppage started on the evening of Monday, July 7, 2014 and all production activities at the mine have ceased since that date, it added.
July 15, 2014
10:00 EDTSSRIOn The Fly: Analyst Upgrade Summary
Subscribe for More Information
July 14, 2014
18:46 EDTSSRISilver Standard upgraded to Outperform from Market Perform at BMO Capital
Subscribe for More Information
08:10 EDTHLHecla Mining sees Q2 silver production up 14% vs. last year
Subscribe for More Information
07:04 EDTAGFirst Majestic announces spin-out of non-core exploration properties
Subscribe for More Information
07:02 EDTAGFirst Majestic announces 3.86M silver eqv. ounces produced in Q2
First Majestic announced that total production at its five operating silver mines in Mexico for the second quarter reached a new quarterly record of 3,855,224 equivalent ounces of silver, representing an 18% increase compared to the same quarter in 2013. Total silver production for the quarter consisted of 3,098,218 ounces of silver, representing an increase of 12% compared to the same quarter in 2013. In addition, 9,131,149 pounds of lead and 2,637,967 pounds of zinc were produced, representing an increase of 54% and a decrease of 9%, respectively, compared to the same quarter of the previous year. Also produced were 2,801 ounces of gold, representing an increase of 40% compared to the second quarter of 2013. The total ore processed during the quarter at the Company's five operating silver mines: La Encantada, La Parrilla, Del Toro, San Martin and La Guitarra, amounted to 671,024 tonnes, reflecting no significant variation year-over-year and represents a 5% increase over the previous quarter.
July 10, 2014
11:00 EDTAGHigh option volume stocks
High option volume stocks: CBS MEMP EWT CBSO DRWI TRW TTS EXK MEOH AG
05:19 EDTSSRISilver Standard reports Q2 production results
Silver Standard Resources provides Q2 operational update for the Pirquitas mine in Jujuy, Argentina and the Marigold mine in Nevada, U.S. The Pirquitas mine produced 2M ounces of silver during Q2, higher than the 1.9M ounces produced in Q1. The mine also produced 9.3M pounds of zinc in zinc concentrate in Q2. The quarter-on-quarter increase in metal production is due to an increase in head grade as a result of specific locations mined in accordance with the company's mine plan. During Q2, the company recognized sales of 1.9M ounces of silver and 5.3M pounds of zinc. The decrease in zinc sales reflects unusually high Q1 sales and timing of deliveries. Approximately 402,000 tonnes of ore were milled during Q2, compared to 406,000 tonnes in the Q1. Ore was milled at an average rate of 4,423 tonnes per day, 11% above the mill's nominal design. This compares to an average milling rate of 4,514 tonnes per day in Q1. During the Q2, the Marigold mine produced 22,060 ounces of gold, exceeding quarterly guidance by 10%. Gold sales totaled 21,990 ounces for the quarter. The majority of ore mined in Q2 was from the lower grade upper portions of the Mackay Phase 1 pit while less material was sourced from the Target pit as the company completed Phase 1. The mine moved a total of 18.3M tonnes of material, of which 2.4M tonnes of ore was delivered to the heap leach pads at a grade of 0.34 g/t gold.

Sign up for a free trial to see the rest of the stories you've been missing.

I agree to the theflyonthewall.com disclaimer & terms of use