|
|
News Breaks
|
November 30, 2011
|
| 09:21 EDT |  | CXPO |
| theflyonthewall.com: | Crimson Exploration provides drilling update | | In Karnes County, the Littlepage McBride #3H, targeting the Eagle Ford Shale formation, commenced production at a gross rate of 1,045 Boepd on a 14/64th choke and 3,057 psi of flowing tubing pressure. The well was drilled to a total measured depth of 16,613 feet, including a 5,918 foot lateral, with 15 stages of frac. The Littlepage McBride #4H, also targeting the Eagle Ford Shale formation, commenced production at a gross rate of 1,126 Boepd on a 14/64th choke and 3,072 psi of flowing tubing pressure. The well was drilled to a total measured depth of 16,803 feet, including a 6,061 foot lateral, with 20 stages of frac. Drilling operations have recently concluded on the Littlepage McBride #6H where the well was drilled to a total measured depth of 16,059 feet, including a 5,290 foot lateral. :theflyonthewall.com |
|
|
News For CXPO From The Last 14 Days Check below for free stories on CXPO the last two weeks.
| Sign up for a free trial to see the rest of the stories you've been missing. |
There are no results for these search parameters.
|
|
|
|