New User:

-or-
Username:
Password:
Forgot your password?

Stock Market & Financial Investment News

News Breaks
August 21, 2014
08:43 EDTCPSTCapstone Turbine announces follow-on order for 75 C65s from Horizon Power
Capstone Turbine announced that it received an order for seventy five C65 microturbines, scheduled for shipment through December 2014, from Horizon Power Systems for several U.S. Oil and Gas Customers. The order was placed by Horizon Power Systems, Capstone's distributor for the Eagle Ford, Permian, Barnett, Mancos, San Juan, and Wattenberg shale plays. Recognizing Capstone's demonstrated success in oil and gas operations, multiple customers are again choosing clean and green microturbine technology to power their production and compression operations. This order will expand Horizon's fleet to approximately 700 Capstone microturbines, the majority of which serve the demanding oil and gas market. The microturbines will provide prime power and serve all stages of oil and gas production including central processing station power, wellhead operation, transmission, and flare reduction.
News For CPST From The Last 14 Days
Sign up for a free trial to see the rest of the stories you've been missing.
December 15, 2014
08:40 EDTCPSTCapstone Turbine up 11.3% after securing Mexican pipeline project
08:40 EDTCPSTCapstone Turbine secures order from Mexican pipeline project
Capstone Turbine announced that it received an order for six C800 microturbines and sixteen C30 microturbines for the second phase of the Los Ramones pipeline project in Eastern Mexico. Industrias Energetícas, Capstone's distributor in Mexico, secured the order, which is one of the largest in Capstone's history. The pipeline project is a part of the Mexican Energy Reform, which was established as a way to reduce electricity and gas prices in the country over a span of two years. The Energy Reform will also expedite natural gas production, from 5,700 million cubic feet a day, or Mcf/d, in 2013 to 8,000 Mcf/d in 2018 and 10,400 Mcf/d in 2025. The entire project will cost $2.5B and carry natural gas over a distance of 1,021 kilometers, supplying one-third of Mexico's natural gas needs at a much lower cost than that which is currently being shipped in liquefied form from the Middle East, Africa and South America. Six C800 high-pressure natural gas microturbines will be installed at two compression stations of the pipeline project and sixteen C30 microturbines at metering stations in between. The microturbine systems will all operate in stand-alone mode, acting as the primary source of power at each location.
December 8, 2014
08:31 EDTCPSTCapstone Turbine secures 3MW order to upgrade glasshouse in South Australia
Capstone Turbine announced that it received an order from Optimal Group for three C1000 microturbines to upgrade D'VineRipe's 27 hectare glasshouse located at Two Wells in South Australia. Optimal Group, Capstone's Australian distributor, secured the order, which is expected to be installed and commissioned in April 2015. Earlier this year, Capstone received an order from Optimal Group for fifty C65 microturbines with integrated heat exchangers for the launch of its microturbine based rental fleet. The D'VineRipe glasshouse project will increase the total amount of Capstone microturbine power in Australia to 18MW.

Sign up for a free trial to see the rest of the stories you've been missing.

I agree to the theflyonthewall.com disclaimer & terms of use