Capstone receives 5MW follow-on order from Genalta Power in Canada Capstone Turbine announced that it received a follow-on order for five C1000 Power Packages from Genalta Power Inc. in Canada. The initial order from Genalta Power was for three C1000 Power Packages in September 2011.
News For CPST From The Last 14 Days
Check below for free stories on CPST the last two weeks.