Brigus Gold temporarily suspends milling operations at Black Fox Mill Brigus Gold reports that due to abnormally heavy rainfall and melting of the remaining snowpack, water levels in the holding facility and water management facilities at the Black Fox Mill are higher than recommended. As a precautionary measure the company has temporarily suspended milling operations at the Black Fox Mill. This suspension occurred on May 12th. Milling operations will resume when water levels have been normalized. Underground and open pit mining operations at the Black Fox Mine are not affected and the company is stockpiling ore to be processed once milling operations are resumed.