|
|
News Breaks | | | | March 14, 2013 | | 08:25 EDT |  | ASM | Avino Silver & Gold Mines anounces February production results from San Gonzalo Avino Silver and Gold Mines announced February production results from its San Gonzalo mine operation located on the Avino property near Durango, Mexico. Milling continued throughout February with an average throughput of 229 tonnes per day. February total mill feed in tonnes was 6,418, and year-to-date 12,810. Total silver in ounces produced was 50,315 in February and 103,094 year-to-date. Total gold produced in ounces was 162 in February, and 346 year-to-date. | |
|
News For ASM From The Last 14 Days Check below for free stories on ASM the last two weeks. |
|
|
| There are no results for ASM |
|
|
|
|
|
|